Worked Example 1 – Single Dwellings

KEY

Building 1

(This example also applies to Building 2)

Number of dwellings1A detached building is one dwelling
Number of associated spaces4Building 1 has 4 demised spaces
Number of EVCPs required1There is 1 dwelling in the building
Number of future connection locations required0There are no more than 10 spaces associated to this building

KEY

Building 4

Number of dwellings1A detached building is one dwelling
Number of associated spaces1Building 4 has 1 demised space
Number of EVCPs required1There is 1 dwelling in the building
Number of future connection locations required0There are no more than 10 spaces associated to this building

Technical notes

  • Car ports or garages for single dwellings do not count as “covered”
  • Challenges: Parking space for building 4 is not adjacent to dwelling. Not recommended to mount EVCPs inside
  • garages. EVCPs cannot practically be mounted on fences, which are considered movable objects.
  • Possible solution: wall mount on the pier of garage if appropriate clearances per manufacturers guidelines. (Note that space requirements stated in diagrams 6.4 and 6.5 of Part S are for future connection locations, not EVCPs)
  • Possible solution: install an EVCP post next to driveway

Worked Example 2 – Terraced Houses

KEY

Building 11

(This example also applies to Buildings 12, 13, 14 and 15)

Number of dwellings1Each dwelling in a row of terraces is considered to be a building
Number of associated spaces2Building 11 has 2 demised spaces
Number of EVCPs required1There is 1 dwelling in the building
Number of future connection locations required0There are no more than 10 spaces associated to this building

Technical notes

  • Challenges: A private shared footpath runs between the spaces and the dwellings. Potential trip hazard of cables crossing the path.
  • Possible solution: install EVCP posts next to spaces. Cable runs from each house distribution board under the private path.

Worked Example 3 – Apartment blocks

KEY

Building A

Number of dwellings6An apartment building with communal facilities is considered to be one building
Number of associated spaces7Spaces labelled A are communal and demised to Building A.
Number of EVCPs required6There are 6 dwellings in the building
Number of future connection locations required0There are no more than 10 spaces associated with this building

KEY

Building B

Number of dwellings6Each dwelling in a row of terraces is considered to be a building
Number of associated spaces13Spaces labelled B1 to B6 are demised to dwellings B1 to B6. Space labelled V is for visitors to Building B.
Number of EVCPs required6There is 1 dwelling in the building
Number of future connection locations required7There are more than 10 spaces associated with this building so cable routes are required to all spaces that don’t have EVCPs

Technical notes

  • Double charge posts can be installed where appropriate, which serve two spaces. Future connection locations can also be located similarly. Refer to Approved Document Part S paragraph 6.6.
  • Building A has an accessible space so one of the EVCPs needs to serve this.

Worked Example 4 – Terraced houses with unequal designation of parking spaces

KEY

Building 31

(This example also applies to Buildings 32, 33 and 34)

Number of dwellings1Each dwelling in a row of terraces is considered to be a building
Number of associated spaces2Building 31 has 2 demised spaces
Number of EVCPs required1There is 1 dwelling in the building
Number of future connection locations required0There are no more than 10 spaces associated with this building

Building 35

Number of dwellings1An apartment building with communal facilities is considered to be one building
Number of associated spaces0No spaces are available to building 35. (All spaces on the development site are demised to other buildings)
Number of EVCPs required0There are 0 associated spaces so no requirement for EVCPs
Number of future connection locations required0There are 0 associated spaces so no requirement for cable routes

Technical notes

  • Challenges: A private footpath runs between the spaces and the dwellings.
  • Potential trip hazard of cables crossing the path.
  • Possible solution: install EVCP posts next to spaces. Cable runs from each house distribution board under the private path.

Worked Example 5 – Semi-detached houses with parking on the other side of the road

KEY

Building 61

(This example also applies to Buildings 62, 63, 64, 65 and 66)

Number of dwellings1Each dwelling in a row of terraces is considered to be a building
Number of associated spaces2.28Building 61 has 2 demised spaces. There are also 2 communal visitor spaces for the use of dwellings 1 to 7. These are associated pro-rata based on the number of dwellings: 2 demised spaces + (2 visitor spaces / 7 dwellings) = 2.28 associated spaces
Number of EVCPs required1There is 1 dwelling in the building
Number of future connection locations required0There are less than 10 spaces associated with this building

Building 67

Number of dwellings1
Number of associated spaces1.28Building 67 has 1 demised space. There are also 2 communal visitor spaces for the use of dwellings 1 to 7: 1 space + (2 visitor spaces / 7 dwellings) = 1.28 associated spaces
Number of EVCPs required1
Number of future connection locations required0

Technical notes

  • Challenge: due to the risk and liability for future maintenance, a Local Authority is likely to choose not to adopt any road or footpath that has privately owned street furniture (e.g. EVCPs) or cable routes running underneath it. The implication is that many roads in new build estates that might otherwise be expected to be adoptable would not be.
  • Possible solution: a dedicated feeder pillar (provided and installed by the DNO) may be appropriate. Consider the size and footprint required for the cabinet. Consider that each feeder pillar is a new connection and carries a separate standing charge for the home owner.
  • Possible solution: A single feeder pillar could serve several EVCPs – however, this would require a management company to allocate the charging costs to individual home owners.
  • A third-party-operated EVCP service with a smart method of metering may be an acceptable way to meet the Part S requirements. EVCPs would have to be private, not public charge points.

Worked Example 6 – Remote spaces separated from building by existing adopted road or footpath

KEY

Building 71

(This example also applies to Buildings 72, 73, 74, 75 and 76)

Number of dwellings1
Number of associated spaces0Building 71 has 2 demised spaces. These spaces are separated from the building by an existing adopted road or footpath (or land in other ownership at the time of construction) and therefore are not considered to be associated.
Number of EVCPs required0There are no associated spaces and therefore no EVCPs required
Number of future connection locations required0

Technical notes

  • None

Worked Example 7 – Dwellings with communal parking

KEY

Building 41

(This example also applies to Buildings 42, 43, 44 and 45)

Number of dwellings1Each dwelling in a row of terraces is considered to be a building
Number of associated spaces2Building 41 has two demised spaces
Number of EVCPs required1There is 1 dwelling in the building
Number of future connection locations required0There are no more than 10 spaces associated with this building

Building C 

Number of dwellings8An apartment building with communal facilities is considered to be a single building
Number of associated spaces16Spaces C1 to C8 are demised to the dwellings in Building C
Number of EVCPs required8There are 8 dwellings in the building so 8 EVCPs are required
Number of future connection locations required16There are more than 10 spaces associated with this building so cable routes are required to all spaces that don’t have EVCPs

Technical notes

  • Cable routes are not required to the second demised space to each of the terraced houses
  • Double charge posts / future connection locations can be installed where appropriate.
  • Challenge: spaces associated with the terraced dwellings are remote from the dwelling and would require very long cable runs.
  • Possible solution: a dedicated feeder pillar (provided and installed by the DNO) may be appropriate. Consider the size and footprint required for the cabinet. Consider that each feeder pillar is a new connection and carries a separate standing charge for the home owner.
  • Possible solution: In this case it might make sense to have a single management company across the apartments and terraced dwellings to allocate the charging costs to individual home owners.

Worked Example 8 – Apartment blocks with covered parking

KEY

Building D 

Number of dwellings6An apartment building with communal facilities is considered to be one building
Number of associated spaces9Spaces 1 to 6 are demised to the apartments in building D. There are also 3 communal visitor spaces. There are 6 uncovered spaces and 3 covered spaces
Number of EVCPs required3There is 1 dwelling in the building
Number of future connection locations required3There are no more than 10 spaces associated with this building

KEY

Building E

Number of dwellings10
Number of associated spaces20There are 13 covered spaces and 7 uncovered spaces demised to Building E.
Number of EVCPs required7The maximum number of EVCPs is limited by the number of uncovered spaces
Number of future connection locations required13There are more than 10 associated spaces, so all remaining spaces will require future connection locations

Technical notes

  • None

Worked Example 9 – Mixed-use apartment block with non-residential units

KEY

Residential (upper floor)

Number of dwellings10
Number of associated spaces13Spaces labelled R and V are demised for the use of the apartments in building M
Number of EVCPs required10
Number of future connection locations required3There are more than 10 spaces associated with the residential building so cable routes are required to all spaces without EVCPs

Residential (upper floor)

Number of dwellings0
Number of associated spaces12Spaces labelled NR are demised to the non-residential commercial units in the building
Number of EVCPs required1There are more than 10 spaces associated with the non-residential building, so 1 EVCP is required.
Number of future connection locations required3There are more than 10 associated spaces, so future connection locations are required to at least 20% of remaining spaces. 11 remaining associated spaces (without EVCP) x 20% = 2.2 spaces. Therefore future connection locations to 3 additional spaces are required.